North Merrick Union Free School District

Project:

2012- $1.6 Million Capital Improvements
2015 – $15.75 Million Bond Referendum

Architect:

JAG Architect, PC

 

  • Remove & Replace Boilers, Univents, HVAC Controls & All Associated Heating Equiptment In All Buildings.
  • Abandon Steam pipes at the Camp Ave. Schools Heating System & Replace With Hot Water System.
  • Parking Lot & Bus Loop Site Work at Old Mill Road School
  • Domestic Hot Water Heater Removal & Replacement at HDF
  • A/C of the Area of General Assembly in Each Building
  • Interior Door Work in Each Building
  • Lintel & Foundation Work in all Buildings Where Needed
  • Asbestos Work as it Relates to the Above & Flooring Abatement & Replacement in all Buildings

North Merrick Union Free School District

Project:

2012- $1.6 Million Capital Improvements
2015 – $15.75 Million Bond Referendum

Architect:

JAG Architect, PC

 

  • Remove & Replace Boilers, Univents, HVAC Controls & All Associated Heating Equiptment In All Buildings.
  • Abandon Steam pipes at the Camp Ave. Schools Heating System & Replace With Hot Water System.
  • Parking Lot & Bus Loop Site Work at Old Mill Road School
  • Domestic Hot Water Heater Removal & Replacement at HDF
  • A/C of the Area of General Assembly in Each Building
  • Interior Door Work in Each Building
  • Lintel & Foundation Work in all Buildings Where Needed
  • Asbestos Work as it Relates to the Above & Flooring Abatement & Replacement in all Buildings