North Merrick Union Free School District
Project:
2012- $1.6 Million Capital Improvements
2015 – $15.75 Million Bond Referendum
Architect:
JAG Architect, PC
- Remove & Replace Boilers, Univents, HVAC Controls & All Associated Heating Equiptment In All Buildings.
- Abandon Steam pipes at the Camp Ave. Schools Heating System & Replace With Hot Water System.
- Parking Lot & Bus Loop Site Work at Old Mill Road School
- Domestic Hot Water Heater Removal & Replacement at HDF
- A/C of the Area of General Assembly in Each Building
- Interior Door Work in Each Building
- Lintel & Foundation Work in all Buildings Where Needed
- Asbestos Work as it Relates to the Above & Flooring Abatement & Replacement in all Buildings
North Merrick Union Free School District
Project:
2012- $1.6 Million Capital Improvements
2015 – $15.75 Million Bond Referendum
Architect:
JAG Architect, PC
- Remove & Replace Boilers, Univents, HVAC Controls & All Associated Heating Equiptment In All Buildings.
- Abandon Steam pipes at the Camp Ave. Schools Heating System & Replace With Hot Water System.
- Parking Lot & Bus Loop Site Work at Old Mill Road School
- Domestic Hot Water Heater Removal & Replacement at HDF
- A/C of the Area of General Assembly in Each Building
- Interior Door Work in Each Building
- Lintel & Foundation Work in all Buildings Where Needed
- Asbestos Work as it Relates to the Above & Flooring Abatement & Replacement in all Buildings