Deer Park Union Free School District

Projects:

1996 – $23 Million Bond Referendum
2009 – $1.5 Million Capital Improvements
2015 – $17 Million Bond Referendum

Architects:

Baldassano Architectural Group
JAG Architect, PC

 

  • Interior Alterations
  • Curtain-wall Replacement
  • Technology Wiring
  • ADA Upgrades
  • Renovation of Bathrooms
  • Elevator Installations at (2) Elementary Schools
  • Assisted in the Closeout of 60 open contracts
  • Synthetic Turf Field Construction
  • Roof Replacement
  • Masonry Restoration
  • District – Wide Roof Replacement

Deer Park Union Free School District

Projects:

1996 – $23 Million Bond Referendum
2009 – $1.5 Million Capital Improvements
2015 – $17 Million Bond Referendum

Architects:

Baldassano Architectural Group
JAG Architect, PC

 

  • Interior Alterations
  • Curtain-wall Replacement
  • Technology Wiring
  • ADA Upgrades
  • Renovation of Bathrooms
  • Elevator Installations at (2) Elementary Schools
  • Assisted in the Closeout of 60 open contracts
  • Synthetic Turf Field Construction
  • Roof Replacement
  • Masonry Restoration
  • District – Wide Roof Replacement